Douglas 1 corridor - evening construction starting Monday, March 10
The Core Lab window will not be available during this time. Alternate access is available using door # 8-101, located in the north/south Douglas 1 corridor. Elevator and stair access to and from Douglas 1 will not be available. Appropriate signage will be posted on the floor above and below the affected area. Construction signs and barriers will be installed each evening on Douglas 1 and then removed each morning to allow regular traffic to resume. Posted: 2014 March 10
xp2014april.htm |